1. PHOSPHATE PLANT AQABA (JORDAN) - Erection of no. 2 Waste Heat Boiler into phosphate plant, including DISMANTLING, main-process pipelines tie-in and local certification with regulatory authority - New unit installATION and main-process pipelines tied-in
2. ENEL PRODUZIONE – Coke-fired 3 x 660 MW Power Plant Torrevaldaliga Nord (Italy) Site erection of "hot-furnace boiler sections" for Unit 4 and Unit 3 of Power Plant "clean-coke technology - Boiler nose-section
3. SUPPLY AND ERECTION OF N° 11 S&T HEAT EXCHANGERS - BULGARIA
4. SUPPLY AND ERECTION OF N° 6 S&T HEAT EXCHANGERS - OMAN
5. ENEL PRODUZIONE – Coke-fired 3 x 660 mw Power Plant Torrevaldaliga Nord (Italy) Site erection of "hot-furnace boiler sections" for Unit 4 and Unit 3 of Power Plant "clean-coke technology - The power plant during activity
6. SUPPLY AND ERECTION OF N° 11 S&T HEAT EXCHANGERS - BULGARIA

7. ENEL PRODUZIONE – 1520 MW TPP TORREVALDALIGA SUD (Italy) SUPPLY AND ERECTION OF LOWER STEAM DRUM
8. ENEL PRODUZIONE –  Coke-fired 3 x 660 Power Plant Torrevaldaliga Nord (Italy) Site erection of "hot-furnace boiler sections" for Unit 4 and Unit 3 of Power Plant "clean-coke technology - Mixing panels
9. ENEL PRODUZIONE –  Coke-fired 3 x 660 Power Plant Torrevaldaliga Nord (Italy) Site erection of "hot-furnace boiler sections" for Unit 4 and Unit 3 of Power Plant "clean-coke technology - SH2 tube-bank and pendents
10. Thermal-solar plant ARCHIMEDE Project Priolo G. (Sicily – Italy) - Mechanical machinery design, fabrication and erection of stationary equipment and process-pipelines
11. SUPPLY AND ERECTION OF N° 2 SEPARATORS - QATAR
12. SUPPLY AND ERECTION OF N° 1 DISTILLATION COLUMN - ITALY

 